As part of its service contract, RQL has completed the construction of storage tanks at the La Guaria Water and Sewerage Association (ASADA) in Pérez Zeledón and has begun work on improvements to the local water system. This progress is thanks to the efforts of the construction team, the ASADA, the Social Welfare Institute (IMAS), and the Costa Rican Water and Sewerage Institute (AyA).
Contact us: Use any of our contact methods to get in touch with us whenever you like. We'll be happy to assist you.
RQL is carrying out the construction of a 100 m³ concrete storage tank as part of the second phase of its contract with the ASADA (Water and Sewerage Association) of San Ramón Sur in Pérez Zeledón. This tank project also includes the construction of a chlorination system building. We appreciate our clients' trust in this important project.
Contact us: Use any of our contact methods to get in touch with us whenever you like. We'll be happy to assist you.
RQL provides potable water storage tank repair services to AyA. Their work includes external surface restoration, internal waterproofing, internal and external painting, replacement of lids, ventilation systems, and ladders.
Contact us: Use any of our contact methods to get in touch with us whenever you like. We'll be happy to assist you.
The project consisted of the design and construction of civil and electromechanical works for the implementation of the San Blas Well, with the objective of incorporating a new source of drinking water supply and strengthening the existing system.
As part of the work, we collaborated with the company Ampere to develop the medium voltage solution, thus ensuring an adequate and reliable electrical supply for the operation of the well.
RQL, in collaboration with Electrobeyco, is undertaking the automation of the AyA (Costa Rican Water and Sewerage Institute) drinking water pumping system in La Cuesta de Corredores, Puntarenas. The project involves the supply, design, assembly, programming, and commissioning of an automated pumping system for AyA. The system utilizes PLC-based automation, variable frequency drives, a state-of-the-art touchscreen, pressure sensors, and level sensors.
Contact us: Use any of our contact methods to get in touch with us whenever you like. We'll be happy to assist you.
In the community of Colorado de Abangares, Guanacaste, the construction of a modular water treatment system, a pumping system and related works was carried out as part of the comprehensive improvement of the local aqueduct.
The main objective of the project was to guarantee access to quality drinking water, through a system designed to remove iron and manganese, complying with the technical and regulatory standards of the Costa Rican Institute of Aqueducts and Sewers (AyA).
This solution was adapted to the specific conditions and needs of the community, promoting efficiency, sustainability and a positive impact on the quality of life of the inhabitants of the area.
The project consisted of the supply and installation of electromechanical equipment for the San Jorge Well station in Paso Canoas. This intervention aimed to optimize the operation of the drinking water supply system, improving the efficiency and reliability of the service for the community served by AyA.
Work for AyA in Ciudad Cortés, Osa. RQL, together with the company ALGRASA, is progressing with the installation of a new drinking water distribution line in Ciudad Cortés, Osa, Puntarenas, as part of the contracts they have with AyA in the Brunca region.
Contact us: Use any of our contact methods to get in touch with us whenever you like. We'll be happy to assist you.
Improvement project for the San Ramón Sur aqueduct: penetrations are being drilled to create underground pipe crossings, preventing damage to the asphalt surface of the national highway. This procedure involves drilling with a pneumatic percussion drill known as a "mole," encasing a 150mm SCH 80 metal pipe, and then inserting a 100mm SDR 9 polyethylene pipe inside to carry the potable water. The drilling length varies between 9 and 10 meters. We thank the ASADA (Water and Sewerage Association) for their trust in allowing us to serve them.
Contact us: Use any of our contact methods to get in touch with us whenever you like. We'll be happy to assist you.
Expansion of distribution pipes in ASADA San Rafael Norte of Pérez Zeledón. RQL is making progress on the project to expand the drinking water distribution lines, and in the ASADA of the community of San Rafael Norte of Pérez Zeledón, the installation is being carried out parallel to the Inter-American Highway, National Route 2.
Contact us: Use any of our contact methods to get in touch with us whenever you like. We'll be happy to assist you.